- Discovery MR750 3.0T System Service Methods
- 5690009-2EN Revision 4
- 00000018WIA30DA6410GYZ
- id_20044334.2
- May 12, 2021 4:08:44 PM
Testing MRU finalization
Procedure
- Make sure that any cable removed during testing has been re-connected and close MRU.
- Make sure there is continuity between the MRU and magnet by doing a heater test: