• Discovery MR750 3.0T System Service Methods
  • 5690009-2EN Revision 4
  • Object ID: 00000018WIA30E21130GYZ
  • Topic ID: id_12374015 Version: 1.12
  • Date: Oct 11, 2021 3:47:42 PM

Replacing table electrical docking mechanism components

Removes table components related to electrical docking and installs replacement components.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-60 minutes-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Replacement parts
ItemQuantityPart numberManufacturer
Link Bar Connector Pedal15174518-
Link Rod Connector Kit15769330-2 (GEM)

5769330 (Non-GEM)

-
Shaft Rocker25147700-2 (GEM)

5147700 (Non-GEM)

-
Rocker Clamp25392170 (GEM)

5147701 (Non-GEM)

-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

Please choose from the following: