• Optima MR450w BASE 1.5T System Service Methods
  • 5690012-2EN Revision 3
  • Object ID: 00000018WIA3058E030GYZ
  • Topic ID: id_12373738 Version: 1.3
  • Date: Jul 5, 2019 6:08:29 PM

Hydraulic Fluid Draining and Rotary Pump Replacement Videos

Prerequisites

Table 1. Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
15 minutes120 mins. for Pump replacement; 90 mins. for Hydraulic fluid replacement; 15 mins. for Air bubble extraction5 minutes
Table 2. Tools and test equipment
ItemQuantityEffectivityPart numberManufacturer
Hydraulic Fluid Container. Maximum height 3.5 inches (90 mm), must hold 64 oz. (2 liters). Video example is 2 in. high x 6 in. wide x 12 in. long.1---
Table 3. Consumables
ItemQuantityEffectivityPart numberManufacturer
Hydraulic Fluid2 qts-

See FRU manual

-
Absorbent TowelsAs Needed-

N/A

-
Wire TiesAs Needed-

N/A

-
Table 4. Replacement parts
ItemQuantityEffectivityPart numberManufacturer
Rotary Pump1-

See FRU manual

-
Table 5. Safety

About this task

Overview

Visit the MR Service Documentation Website to view three different video clips showing the process to:

  • Replace the rotary pump

  • Drain the table hydraulic fluid

  • Remove air bubbles

Note:

These videos are for reference only and are not intended to replace the existing service manual procedures. Refer to Patient Table Hydraulic Rotary Pump Replacement and Hydraulic Fluid Level Check and Fill for detailed instructions.

Procedure

  1. Replace the rotary pump. Refer to the Replace Rotary Pump video on the MR Service Documentation Website.
  2. Replace the hydraulic fluid only. Refer to the Replace Hydraulic Fluid Only video on the MR Service Documentation Website.
    Note:

    Three points to be aware of during the video:

    • To unclip the hose clamp, twist the clip ends in opposite directions

    • Note the point in the video when the hose end is covered to prevent hydraulic fluid from draining

    • The fluid height in the reservoir will change depending on the height of the table. For the final fill, the table is raised to full height—ensure the reservoir is only half-full

  3. Extract air bubbles from the hydraulic lines. Refer to the Extract Air Bubbles video on the MR Service Documentation Website.

Finalization

No finalization steps.