TO PREVENT FATAL ELECTRIC SHOCK, DISCONNECT POWER FROM THE
PDU BEFORE YOU PERFORM THE FOLLOWING PROCEDURES.
PERFORM LOCKOUT / TAGOUT PROCEDURE PER GE OSHA LOCKOUT
/ TAGOUT REQUIREMENTS LISTED IN THE FIELD SERVICE EHS MANUAL &
TRAINING 2000 P/N 2135387-200.
Warning
POSSIBLE PERSONAL INJURY!
THIS PROCEDURE REQUIRES movement OF FERROUS MATERIAL IN
CLOSE PROXIMITY TO THE MAGNET
TWO FIELD ENGINEERS ARE REQUIRED AT ALL TIMES.
Warning
Personal injury and equipment damage
Strong Magnetic Field
When servicing any magnetic equipment, it is critically important that the service engineer consciously plan the path to be taken when moving highly ferrous devices in the magnet environment. the path should be as far from the magnet as practical.
Safety Requirements
The service path must allow for the dock to be moved along the ground a distance equal to that of the distance between the magnet and the foot-end of the patient table prior to being lifted vertically.
Two (2) MR safety trained personnel must be present at all times when servicing highly ferrous devices in the areas of magnetic fields.
When planning a service path, it is critical that the path be clear and sufficiently wide. Ensure that there are no trip hazards, obstacles, clutter, slippery surfaces or other items even partially restricting the path. If there are portable obstacles in a path, remove them from the area and replace them after the service action is completed. It is required to walk the path prior to beginning service to ensure that there is sufficient space through which to pass for yourself and the object being serviced.
About this task
Overview
The Motor On actuation switch in the dock assembly should be
adjusted so it is activated when the Table Up foot pedal is pressed
approximately 3/4 of its total length of travel. This is factory adjusted;
however, it is possible to adjust the position of the Motor On switch
in the field to maintain the proper actuation level.