• Discovery MR750 3.0T System Service Methods
  • 5690009-2EN Revision 4
  • Object ID: 00000018WHA30A672GYZ
  • Topic ID: id_2001608 Version: 1.13
  • Date: Dec 20, 2021 4:01:36 PM

Replacing the Patient Handling Power Supply (PHPS) 2

This procedure describes the removal and installation of the Patient Handling Power Supply 2 (PHPS2), which is a core component of the Patient Handling Sub-System (PHSS). The Patient Handling Power Supply 2 (PHPS2) provides power to the other components in the PHSS, and serves as an interface between them and the equipment room.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-60 minutes15 minutes
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Replacement parts
ItemQuantityPart numberManufacturer
Patient Handling Power Supply 2 (RoHS)15167111-51-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.