- SIGNA MR355 / SIGNA MR360
- Service Manual
- 5856356-3EN Revision 5.0
- Basic Service Documentation. Copyright General Electric Company.
- 00000018WIA30A67E20GYZ
- id_131070303.0
- Aug 29, 2019 1:36:42 AM
LVShim Tools And Phantom Setup
Prerequisites
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|---|---|---|
| 1 | Not Applicable | 10 minutes | Not Applicable |
| Item | Quantity | Effectivity | Part number | Manufacturer |
|---|---|---|---|---|
| ·LVShim Phantom Assembly | 1 | - |
2125245 (1.5T) 2360054 (3.0T) | - |
| ·Nesting Plate Assembly | 1 | - |
2125247 | - |
| ||||||||
| Condition | Reference | Effectivity |
|---|---|---|
|
Incorrect data possibility. Before any LVShim is performed, the DC Offset must be performed. Failure to do so will cause errors in the LVShim results, and will increase the time it takes to shim the magnet. | - | - |
|
Magnet should be ramped and parked. | - | - |
|
For LCC Magnet - Pre-Cool Shim Lead before installing. | - | - |
|
For LCC Magnet - Coldhead turned off for 10 minutes to dump flux build-up in S/C shield around Coldhead. | - | - |
|
For LCC Magnet - Pressure Controller should be installed and working. | - | - |
|
For LCC300 Magnets, passive shim should be performed to spec. | - | - |
|
Shim currents entered into shim power supplies after main field has stabilized. | - | - |
|
All RF setup and calibrations completed. | - | - |
|
Longitudinal drive cal completed. | - | - |
|
X, Y and Z gradients all calibrated (i.e., Gradcal procedure complete). | - | - |
|
For TwinSpeed, ensure that all the calibration procedures above have been completed for both GradModes. | - | - |
About this task
Procedure
Finalization
No finalization steps.

