• Discovery MR750 3.0T System Service Methods
  • 5690009-2EN Revision 4
  • Object ID: 00000018WHA305C3EGYZ
  • Topic ID: id_2002769 Version: 4.0
  • Date: Nov 3, 2021 4:05:16 PM

Running LVShim

The objective of the LVShim tool is to fine-tune magnet homogeneity.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-30 minutes10 minutes
Tools and test equipment
ItemQuantityPart numberManufacturer
LVShim Phantom Inner Sphere12274476-
LV Phantom Small Half Assembly12306642-
LV Phantom Big Half Assembly12306645-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.