• Discovery MR750 3.0T System Service Methods
  • 5690009-2EN Revision 4
  • Object ID: 00000018WIA303A4510GYZ
  • Topic ID: id_2004633 Version: 4.1
  • Date: Jul 13, 2021 4:16:32 PM

Checking the gradient and system PDU power and ground connection

PDU power and ground connections need to be tight in order to avoid system failures.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
110 minutes90 minutes10 minutes
ItemQuantityPart numberManufacturer
Arc Flash PPE1--
Personal Lock 1--
Red LOTO Personal Lock Wrap1--
Multi-locking Device (If multiple service people)1--
Red Warning LOTO Tag1--
Digital Voltmeter1--
Torque Wrench1--
Standard Socket Wrench Set1--
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.