- Discovery MR750w and SIGNA™ Architect T 3.0T System Service Methods
- 5690002-2EN Revision 4
- 00000018WIA30622750GYZ
- id_20255711.2
- Oct 11, 2021 6:13:21 PM
Probe/SV SNR testing
Probe/SV SNR Procedure
About this task
Use the MRS phantom (without the loader) for the signal-to-noise ratio (SNR) procedure. Enter the most visible number of the temperature strip as a Control Variable (tempC).
Probe-S SNR Procedure
Procedure
Probe-P SNR Procedure
Procedure
Finalization
Remove all service equipment from the system. If you are using the curved table, make sure to remove the service filler panels from under each of the two top panels of the cradle.
.