• SIGNA MR355 / SIGNA MR360
  • Service Manual
  • 5856356-3EN Revision 5.0
  • Basic Service Documentation. Copyright General Electric Company.
  • Object ID: 00000018WIA30A08F20GYZ
  • Topic ID: id_13107395 Version: 2.0
  • Date: Jul 19, 2019 10:59:45 AM

TABLE CHECKS AFTER INSTALLATION

Prerequisites

Table 1. Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
10 minutes30 minutes0 minutes
Table 2. Safety

Table UP/Down check

Procedure

  1. Press Down pedal on the Dock FRP Cover ensure that the table moves to the Down most condition.
  2. Press Up pedal on the Dock FRP Cover ensure that the table moves to the topmost condition.
    Figure 1. Table UP/Down Check
  3. Ensure that the LPCA Latch comes and latches to the Cradle assembly once table reaching to the top most condition.

Cradle In/Out check

Procedure

  1. Press Cradle in button on the Gantry, ensure that the cradle move inside the Bore.
  2. Press Cradle out button on the Gantry, ensure that the cradle moves outside the Bore.
    Figure 2. Cradle In/Out check
  3. Observe for smooth cradle motion without interference with the bridge.

Emergency egress Check

Procedure

Press Cradle in button on the Gantry, Take cradle in by 500mm approximately. Rotate the Handle on the Cradle, and pull the cradle out to the home position. Ensure its possible to pull the cradle with this process.
Figure 3. Emergency egress Check

Home sensor Function Check

Procedure

Press Cradle in button on the Gantry, Take cradle in by 500mm approximately. Press the Down pedal on the Dock FRP cover. Ensure that the table is not coming down.
Figure 4. Home sensor Function Check

Finalization

No finalization steps.