- SIGNA MR355 / SIGNA MR360
- Service Manual
- 5856356-3EN Revision 5.0
- Basic Service Documentation. Copyright General Electric Company.
- 00000018WIA309D6E20GYZ
- id_131070613.0
- Aug 29, 2019 1:35:56 AM
Rough LVShim Procedure
Prerequisites
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|---|---|---|
| 1 | Not Applicable | 1 hours | Not Applicable |
| Item | Quantity | Effectivity | Part number | Manufacturer |
|---|---|---|---|---|
| LVShim Phantom Assembly | 1 | 1.5T |
2125245 | - |
| Nesting Plate Assembly | 1 | - |
2125247 | - |
| ||||||||
About this task
Content in this section consist of: Scan Prep and Scan and Rough Shim Analysis.
-
The objective is to improve the homogeneity to the point where Grafidy and other calibrations can be performed. Use the three-piece LVshim phantom and the LVshim PSD with a starting bandwidth range of 2000 - 5000 Hz. The Rough shim process continues until the sampling diameter has been increased to 45-cm DSV (40-cm DSV for CRM ZOOM Body Coil) and the bandwidth decreased to 1000 Hz. In most cases this should take about 3 iterations.
-
Rough LVshim is normally needed at new sites that have never been shimmed before. If your site has previously been shimmed with LVshim, Quickshim, or CSI Shim, you should skip Rough LVshim and begin with Main LVshim. Rough Shim needs a starting point to work. For a new magnet installation, the magnet ATR shim currents are used for Rough LVshim. The ATR shim currents can be used for all magnet types except S-III with Magnishield.
-
For the LCC Magnet, the cryocooler coldhead must be turned off for 10 minutes before installing the ATR shim currents. This is due to magnetic flux build-up within a superconducting shield around the coldhead sleeve during magnet ramping. Also, the helium vessel pressure must be at 4.0 psi ± 0.3 psi. Failure to scan at the proper pressure will result in erroneous data collection. Refer to LCC Vessel Pressure Controlfor methods to increase vessel pressure during shimming.
Scan Prep and Scan
Procedure
Rough Shim Analysis
Procedure
Finalization
Finalization
No finalization steps.






