Grounding and Leakage Current Checks
There are three procedures associated with checking the grounding and the leakage currents on a MR system. Each procedure requires different tools and test equipment and should be performed in the sequence below.
-
First, perform the Ground Resistance Check
-
Next, complete the Ground Leakage Current Test
-
Finally, perform the PAC Assembly Leakage Current Test