- 00000018WIA30DA6410GYZ
- id_20044334.0
- Apr 25, 2019 1:57:47 AM
Testing MRU finalization
Procedure
- Make sure that any cable removed during testing has been re-connected and close MRU.
- Make sure there is continuity between the MRU and magnet by doing a heater test: