• SIGNA MR355 / SIGNA MR360
  • Service Manual
  • 5856356-3EN Revision 5.0
  • Basic Service Documentation. Copyright General Electric Company.
  • Object ID: 00000018WIA30A57E50GYZ
  • Topic ID: id_2028585 Version: 2.0
  • Date: Feb 21, 2021 9:13:29 PM

Replacing 1.5T HD Quad Extremity Coil Pre-Amp

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-30 minutes -
Tools and test equipment
ItemQuantityPart numberManufacturer
Flat Screwdriver1--
Replacement parts
ItemQuantityPart numberManufacturer
1.5T HD Quad Extremity Coil Pre-Amp15723820Invivo
Required conditions

Observe Anti-Static Precautions. Use a wrist strap and ESD workstation (ESD mat connected to ground and place to connect ESD wrist strap).

Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.