Basic Service Documentation. Copyright General Electric Company.
Object ID: 00000018WIA30D7ED20GYZ
Topic ID: id_13107243 Version: 3.0
Date: Aug 29, 2019 1:52:21 AM
Auto Coil Install
Prerequisites
Table 1. Personnel requirements
Required persons
Preliminary requirements
Procedure
Finalization
1
-
5 minutes
Not applicable minutes
Table 2. Tools and test equipment
Item
Quantity
Effectivity
Part number
Manufacturer
Any new coil that
has not yet been configured for a system.
N/A
-
-
-
About this task
Procedure
Plug the coil into an LPCA Port. The system will automatically
detect the new coil and a pop-up will appear stating the coil has
not yet been configured for this system. See Figure 1