- SIGNA MR355 / SIGNA MR360
- Service Manual
- 5856356-3EN Revision 5.0
- Basic Service Documentation. Copyright General Electric Company.
- 00000018WIA30CE1F20GYZ
- id_131067283.0
- Aug 29, 2019 1:54:36 AM
1.5T HD 8Ch High Res Brain Array Coil Replacements
Prerequisites
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|---|---|---|
| 1 | 0 minutes | 30 minutes | 0 minutes |
| Item | Quantity | Effectivity | Part number | Manufacturer |
|---|---|---|---|---|
| ¼ inch flat blade screwdriver | 1 | - | - | - |
| Item | Quantity | Effectivity | Part number | Manufacturer |
|---|---|---|---|---|
| Refer to FRU Document | NA | - | - | - |
| ||||
About this task
Follow this process to replace field replaceable units for the 1.5T HD 8 Channel High Res Brain Array by Invivo. (M3335LZ)
Cable Replacement
Cable Continuity Check
Procedure
Cable Replacement Procedure
Procedure
Mechanical Parts Replacement
Mechanical Hardware Check
About this task
Lift the coil latches on both sides of the coil, and slide the coil to its superior and inferior extents. The coil must slide freely on the base with no binding or grinding. Make sure that the coil does not move with respect to the baseplate when the latches are locked down.
Procedure
Replacement of Inferior or Superior Mirror
About this task
There are two mirrors included with the 1.5T HD 8 Channel High Res Brain Array: To install either mirror, align the grooves in the base of the mirror with the grooves in the coil mirror mount, and slide the mirror into position. Press and hold the release button on the mirror before attempting to remove the mirror.
-
Superior Mirror
-
Inferior Mirror
Figure 2. Superior Mirror 
Figure 3. Inferior Mirror 
Procedure
Replacing the Mount Plate Assembly
Procedure
Replacing the Spring Foam
Procedure
What to do next
Finalization
No finalization steps.






