• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30D08110GYZ
  • Topic ID: id_2004084 Version: 4.14
  • Date: Feb 2, 2022 2:09:29 PM

Setting up HIS and RIS MWL and PPS for DICOM

Directions on configuring HIS/RIS MWL and PPS for DICOM, checking connectivity, and setting information retrieval preferences.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-15 to 60 minutes, depending on configuration-
Required conditions
Get HIS/RIS and filming network information from customer administrator.
(For PX29.0 and later) If DICOM over TLS setup is desired, set up and install the certificates as indicated in the MR Scanner Setup as secure client workflow.
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.