• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30812110GYZ
  • Topic ID: id_2003466 Version: 3.6
  • Date: Oct 4, 2021 4:13:45 PM

Installing the magnet front cover

Installs the front cover onto the magnet.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
2-5 hours-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-

About this task

Do the following tasks to complete installing the magnet front cover:
  • Installing the magnet front cover
  • Installing the magnet left and right control panel covers
  • Removing LOTO - ISC
  • Starting up the host computer
  • Checking the magnet front cover components
  • Installing the magnet right-hand center cover
  • Installing the magnet right-hand bottom cover
  • Installing the rear bridge inner cover
  • Installing the rear bridge cover
  • Installing the magnet left-hand upper front cover
  • Installing the magnet right-hand top cover
  • Installing the magnet rear cable cover bracket
  • Installing the magnet rear cable cover
  • Installing the magnet rear trim ring
  • Installing the magnet upper service access panel
  • Installing the magnet left-hand lower front cover
  • Installing the magnet service access vent
  • Installing the magnet rear service access panel
  • Installing the magnet front service access panel
  • Installing the magnet service access trim
  • Installing the front endbell
  • Installing the table interface cover
  • Installing the magnet left- and right-hand lower access panels