• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA309E2110GYZ
  • Topic ID: id_2003585 Version: 3.3
  • Date: Jul 7, 2021 3:51:54 PM

Installing the magnet left-hand upper front cover

Installs the upper cover onto the front left-hand corner of the magnet.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
2-75 minutes-
Tools and test equipment
ItemQuantityPart numberManufacturer
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

About this task

Do the following tasks to complete installing the magnet left hand upper front cover:
  • Installing the magnet left-hand upper front cover
  • Installing the magnet right-hand top cover
  • Installing the magnet rear cable cover
  • Installing the magnet rear trim ring
  • Installing the magnet upper service access panel
  • Installing the magnet left-hand lower front cover
  • Installing the magnet service access vent
  • Installing the magnet rear service access panel
  • Installing the magnet front service access panel
  • Installing the magnet service access trim
  • Installing the magnet left- and right-hand lower access panels