- Discovery MR750 3.0T System Service Methods
- 5690009-2EN Revision 4
- 00000018WIA30F48030GYZ
- id_123737032.1
- Oct 11, 2021 3:47:41 PM
Calibrating PROBE Tuning and SNR Check
Prerequisites
| Personnel requirements | |||
|---|---|---|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
| 1 | - | 90 minutes | - |
| Tools and test equipment | |||
|---|---|---|---|
| Item | Quantity | Part number | Manufacturer |
| MRS phantom without the loader is required for the Probe SNR and is used for the tuning process. | 1 |
2152220 | - |
| 3.0T Split-Top Head Coil | 1 |
5182872 | - |
About this task
- Probe-P option
- Probe-S option which includes Probe-P
- Breast Spectroscopy