Grounding and Leakage Current Checks

There are three procedures associated with checking grounding and leakage currents on a Signa system. Each procedure requiring different tools and test equipment, and should be performed in the sequence below. .

Ground Resistance Checks Should be Complete first

Next in line to be completed is Ground Leakage Current Test

PAC Assembly Leakage Current Test can be found here