• Topic ID: id_13106455
  • Version: 5.3
  • Date: Mar 4, 2020 10:14:50 AM

Setting up and calibrating UPM - MNS

Sets up and calibrates Universal Power Monitor (UPM) and Multi-Nuclear Spectroscopy (MNS) components.

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 30 minutes 5 minutes
Tools and test equipment
Item Quantity Part number Manufacturer
RF Power Measurement Kit 1

Either 5307511-2 or 5307511-3 (Bird wattmeter)

-
Digital Multimeter 1 46-194427P84 -
3.0T 31P T/R Switch (available on site with customer) 1

2354050 (non-RoHS)

5409918 (RoHS)

-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

  • warning
  • Electrocution hazard
  • Hazardous voltage levels exist throughout the UPM cabinet.
  • Make sure that the RF amplifier is disabled when configuring the calibration tools.