• Topic ID: id_13106299
  • Version: 6.2
  • Date: Feb 25, 2020 9:20:38 AM

Doing Multi-Nuclear Spectroscopy (MNS) functional checks

Prerequisites

Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 15 minutes 45 minutes 30 minutes
Required conditions
Condition Reference
MNS option installed and amplifier calibrated.  
Table 1 Minimum performance limits for the MNS subsystem
Nucleus Field Strength Min Mag at TG = 0 Min. SNR Max NoiseStdev
13C 3.0T 2.0 X 10^8 120 60000
31P 3.0T 2.0 X 10^8 280 60000