Auto Coil Install

Prerequisites

Table 1 Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 - 5 minutes Not applicable minutes
Table 2 Tools and test equipment
Item Quantity Effectivity Part number Manufacturer
Any new coil that has not yet been configured for a system. N/A - - -

Procedure

  1. Plug the coil into an LPCA Port. The system will automatically detect the new coil and a pop-up will appear stating the coil has not yet been configured for this system. See Figure 1

    Figure 1. New Coil Detected Pop-up

Finalization

No finalization steps.