1.5T Phased Array Shoulder Coil Setup for MCQA Test

Prerequisites

Table 1 Personnel requirements
Required persons Preliminary requirements Procedure Finalization
1 Not Applicable 15 minutes Not Applicable
Table 2 Tools and test equipment
Item Quantity Effectivity Part number Manufacturer
1.5T Head TLT Phantom 1 -

46-265826G6

-
Phantom Positioner 1 -

2375136-3

-
Table 3 Required conditions
Condition Reference Effectivity

Requires a minimum of 21.0 M3 software.

- -

Requires a minimum of 20.1 IB1 software.

- -

The following coil configuration name must be installed to run this tool: HDx Shoulder.

- -

Procedure

  1. Position the coil in the cradle, and connect the cable as shown.

    Figure 1. Connecting Cable to Coil

  2. Place a phantom in the coil.

    Figure 2. Positioning Phantom in Coil

  3. Landmark on the coil crosshairs as shown.

    Figure 3. Landmarking Coil on Crosshairs

  4. Run the Multi-Coil Quality Assurance Tool.

Finalization

No finalization steps.