
Direction 2203808, Rev 9
Signa Planned Maintenance
for Signa 5.x, 8.x, 9.x and 10.x
Sections changed with this revision. Take time to read the introduction.
Chapter 1 - Introduction now includes all System PM Schedules and all Magnet PM Schedules, in addition to "Overview", "How to Use this Manual", "Site Log Book", "Tools and Test Equipment" and "Safety" sections. PM Procedures and Appendices remain in separate PDFs (listed below).
NOTICE: The digitized PM Forms for 9.x and 10.x must be accessed, and the appropriate form downloaded from CDL and completed when the PM is performed. The schedules below are provided for reference only, and contain information on the various procedures that require completion for each PM.