Installs the cover onto the top of the right-hand side of the magnet enclosure.
Prerequisites
| Personnel requirements |
|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 2 | - | 45 minutes | - |
| Tools and test equipment |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
About this task
Do the following tasks to complete installing the magnet right-hand top cover:- Installing the magnet right-hand top cover
- Installing the magnet upper service access panel
- Installing the magnet service access vent
- Installing the magnet rear service access panel
- Installing the magnet front service access panel
- Installing the magnet service access trim
- Installing the magnet rear cable cover bracket
- Installing the magnet rear cable cover
- Installing the magnet rear trim ring