Dock removal and reinstallation Do not use (duplicate)--use id_15271114 instead
Prerequisites
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|---|---|---|
| - | 30 minutes for 450, 750, 450w; 60 to 120 minutes for 450w GEM, 750w GEM | - |
| Item | Quantity | Effectivity | Part number | Manufacturer |
|---|---|---|---|---|
| PPE – safety glasses and gloves | 2 | - | - | - |
| Nonmagnetic Titanium Service Tool Kit, Large Set | 1 | - | 5112581 | - |
| IF NEEDED: Magnet Dock Bolt Cutting Kit | 1 | - | 5435943 | - |
| MCRv Tool Kit | 1 | (For 1.5T) | 5182417 | - |
| MCRv Tool Kit 3.0T | 1 | (For 3.0T) | 5182417-2 | - |
| Item | Quantity | Effectivity | Part number | Manufacturer |
|---|---|---|---|---|
| Masking tape | 1 | - | - | - |
| ||||||||||||||||
About this task
Overview
This document contains procedures to remove and reinstall the patient table dock, which is necessary for replacement of hardware internal to the dock such as switches, motor, and springs.
During this procedures, the following tasks are performed:
- Prepare the dock assembly for removal.
- Cut the anchor stud, if necessary.
- Remove the patient table dock assembly from the magnet room.
- Reinstall the patient table dock assembly.
- Confirm that the patient table dock assembly is installed correctly and the system is working properly and ready to be turned over to the customer.
The dock assembly is the most ferrous object in the magnet room. Utmost care must be taken when following these procedures. Never allow the end of the dock assembly (closest to the magnet) to come off the floor while in the magnet room. During the procedure, you will be asked to lift the front end of the dock assembly; the front end of the dock should never be lifted more than 3 inches (7.6 cm) while in the magnet room.
Preparing Dock for Removal
Procedure
Cutting Anchor Stud
Procedure
Removing Dock from Magnet Room
Procedure
Reinstalling Dock
Procedure
Finalization
Procedure
- Perform all finalization steps required in other referenced procedures.
- Ensure that dock motor on switch operates properly when table up pedal is pressed.
- Perform dock adjustments. See Dock Centering and Dock Hook Tension Adjustment. Confirm proper alignment and centering for the dock and table.
- Verify that cradle travel into the bore is smooth.
- Perform Laser Light Alignment.
- Perform DQA II Tool and Troubleshooting.
- Perform Check Scan.