|
Incorrect data possibility. Before any LVShim is performed,
the DC Offset must be performed. Failure to do so
will cause errors in the LVShim results, and will increase the time
it takes to shim the magnet.
|
- |
- |
|
Magnet should be ramped and parked.
|
- |
- |
|
For LCC Magnet - Pre-Cool Shim Lead before installing.
|
- |
- |
|
For LCC Magnet - Coldhead turned off for 10 minutes to dump
flux build-up in S/C shield around Coldhead.
|
- |
- |
|
For LCC Magnet - Pressure Controller should be installed
and working.
|
- |
- |
|
For LCC300 Magnets, passive shim should be performed to
spec.
|
- |
- |
|
Shim currents entered into shim power supplies after main
field has stabilized.
|
- |
- |
|
All RF setup and calibrations completed.
|
- |
- |
|
Longitudinal drive cal completed.
|
- |
- |
|
X, Y and Z gradients all calibrated (i.e., Gradcal procedure complete).
|
- |
- |
|
For TwinSpeed, ensure that all the calibration procedures
above have been completed for both GradModes.
|
- |
- |