- Topic ID: id_17479538
- Version: 2.0
- Date: Nov 19, 2019 11:09:16 PM
Secondary Aperture Replacement
Prerequisites
Overview
Conversion Factor: 1 ft-lb = 1.356 N-m
|
note:
Please check the component P/N when replace the collimator related parts, should be ordered the same P/N according to the label on each component.
Procedure
- Remove gantry power. Be certain to follow appropriate Lockout/Tagout procedures.
- Remove the gantry side, top and front cover.
- Turn OFF all 3 switches (AXIAL DRIVE ENABLE, HVDC ENABLE, 120 VAC) on the Service Switch Panel.
- Position the gantry with the X-Ray Tube at six-o'clock.
- Remove the six countersunk M2.5 flat head mounting screws.
- Remove the secondary aperture and place in shipping container for return. Be careful not to damage the collimator output window.
- Install the new secondary aperture ensuring not to damage any of the interior edges due to the critical nature of x-ray filtering.
- Tighten the six (6) flat head screws using Loctite 242 10CC.
Finalization
- Perform CBF/SAG Alignment Process
