- Topic ID: id_27090681
- Version: 2.0
- Date: Jun 10, 2020 2:29:47 AM
Power Harness Replacement
Prerequisites
Overview
This procedure provides the following:
-
Remove gantry and collimator covers; disconnect Cam A & B power connectors
-
Replace power harness and reconnect power connectors
-
Replace collimator and gantry covers; finalize
|
note:
Please check the component P/N when replace the collimator related parts, should be ordered the same P/N according to the label on each component.
Procedure
- Remove gantry power. Be certain to follow appropriate Lockout/Tagout procedures.
- Remove the gantry side, top and front cover.
- Turn OFF all 3 switches (AXIAL DRIVE ENABLE, HVDC ENABLE, 120 VAC) on the Service Switch Panel.
- Position the gantry with the X-Ray Tube at six-o'clock.
- Remove the top cover from the Collimator by removing the pan head mounting screws with spring washers.
- Cut the tie-wraps holding down the Power Harness.
- Disconnect the Cam A motor drive power connector.
- Disconnect the Cam B motor drive power connector.
- Disconnect J12 from CCB.
- Remove Power Harness and place in packaging to return.
- Place the new Power Harness on the frame.
- Connect J12 to the CCB.
- Connect the Cam A motor drive power connector.
- Connect the Cam B motor drive power connector.
- Tie-wrap the Power Harness.
- Replace the top cover of the Collimator using the pan head mounting screws with spring washers and tighten.
Finalization
- Perform CAM A/B Amplifier Check procedure.
