- Topic ID: id_11038892
- Version: 3.0
- Date: Apr 9, 2020 8:42:49 PM
CAM A/B Amplifier Check
Prerequisites
Procedure
- Check the power supply to AMP.
- Swap cables with the other AMP.
- Select COLLIMATOR AND FILTRATION.
- Exercise the CAM A/B and verify no test failures. See Figure 1.
Figure 1. Collimator CAM Continuous Rotation Test

Finalization
No finalization steps.