• Topic ID: id_11038892
  • Version: 3.0
  • Date: Apr 9, 2020 8:42:49 PM

CAM A/B Amplifier Check

Prerequisites

Procedure

  1. Check the power supply to AMP.
  2. Swap cables with the other AMP.
  3. Select COLLIMATOR AND FILTRATION.
  4. Exercise the CAM A/B and verify no test failures. See Figure 1.

    Figure 1. Collimator CAM Continuous Rotation Test

Finalization

No finalization steps.