- Topic ID: id_23554267
- Version: 1.0
- Date: Oct 9, 2018 1:42:18 PM
JEDI PPC Board Replacement
Prerequisites
Overview
To replace JEDI PPC board:
-
Save JEDI runtime parameters, if possible
-
Replace PPC board
-
Restore JEDI runtime parameters, if previously saved
-
Check functionality of systems
-
Recalibrate
1 PPC Board Removal
Procedure
- If possible, save JEDI runtime parameters (from JEDI to console).
warning- Remove power to the gantry using proper Lockout / Tagout procedures.
- Remove gantry right side cover.
- Turn OFF all the three switches (AXIAL DRIVE ENABLE, HVDC ENABLE, 120 VAC) on the Service Switch Panel.
- Position the inverter assembly at 2 o'clock.
- notice
- Remove largest inverter cover.
- Attach a protective ESD wrist strap.
- Disconnect wires and remove the PPC board.
![]() |
2 PPC Board Installation
Procedure
- Continue using the ESD wrist strap.
- Insert new PPC board and re-connect all wires.
- Replace the hex screws.
- Replace inverter cover.
3 Finalization
Procedure
- Ensure that proper torque specifications (see Torque Wrench Information) are followed for all fasteners.
- Run Flash Download Tool to synchronize PPC firmware with Console software.
- Restore JEDI Runtime Parameters, if you saved JEDI Runtime Parameters prior to replacing the PPC board (see JEDI Generator Tool (Pro16)).
- Run Meter Verification (Pro 16).
- Perform HV Tank Feedback Resistor Verification (Pro 16) (bleeder test)
- Run Filament Calibration.
