• Topic ID: id_16157806
  • Version: 2.0
  • Date: Nov 27, 2020 2:08:26 AM

HHS Scans (Adv)

Prerequisites

Overview

This module explains how to run the “HHS Scans” procedure, which runs an automated scan sequence and measures the kV and mA at times during the scan to ensure that the system is properly calibrated.

Procedure

  1. Launch the GENERATOR TOOL from the Service Desktop.
  2. Launch the HHS SCANS tool.
  3. Run the sequence.
  4. The scan data will be stored on the system and can be viewed using the “HHS Reports” tool. Record results in the appropriate GE e4879 Certified Component Verification form or GE Data Report Planned Maintenance Schedule form, and identify the results by below tables.
  5. Ensure all measurement results in HHS Report are within the specified limits. For failed results, isolate root cause by running the following procedures in order shown below and perform appropriate corrective action.
    1. Meter Verification (Pro, RT, VCT)
    2. HV Tank Feedback Resistor Verification (Pro, RT, VCT)
    3. Filament Calibration

Finalization

Store data form with system history records.