- Topic ID: id_15460597
- Version: 2.0
- Date: Nov 8, 2018 1:36:20 AM
STEP E14: System Functional Test
-
Run the System Scanning Test procedure from the white service CD.
-
Confirm the UPS goes into backup mode on loss of power. Confirm that you can shut down the console and the table is operational before the loss of battery power.
-
Confirm the remote monitor displays the same images as shown on the console image monitor.
-
Confirm the bar code reader is operational and data is displayed.
-
Confirm that an image can be filmed, saved to DVD, and networked to another network device or AWW.
-
Confirm the Nemoto injector is operational, and all setup and calibration procedures are completed. Confirm other injectors can power-up.
-
Confirm the SmartStep option is operational, and the foot switch and hand switch operate.
-
Confirm the cardiac cables are connected to the gantry option panel. Perform the Cardiac Functional Test.
-
Complete the Connect Pro Functional Test. Transfer images to another station via EXPORT DATA in the PATIENT SCHEDULER function.
-
Check all appropriate boxes on the GE Form e4879 Installation Data Verification.