• Topic ID: id_15460556
  • Version: 2.0
  • Date: Nov 8, 2018 1:36:17 AM

STEP 4A: Cut Out Floor Surface Down to Bare Concrete

Notice Image
  • caution
  • Potential for personal injury.
  • Use appropriate safety procedures when drilling the floor holes, especially if there is lead or asbestos in the floor.
  • Appropriate PPE is required when working with hazardous materials.