|
1. Using the GE site drawing, mark ISO and the table
centerline on the floor.
|
|
|
2. Position the table template on the floor first, and
then the gantry template on top. Align the templates to each other
at the two centerlines, and tape the templates together.
|
|
3. Align the templates to the ISO and table centerline
marks on the floor. Tape the templates to the floor.
|
|
4. Verify location with the customer.
|
|
5. Use the center punch to mark the 8 anchor locations.
Mark the ends of the table centerline.
|
|