|
1. Measure and mark two spots 673 mm (26.5 inch) from
the gantry base frame (under the front cable tray) out toward the
table floor cutouts. Snap a chalk line between the two marks.
|
|
|
2. Move the table close to its final position, with the
base frame on the reference line and the leveling pads centered over
the floor cutouts.
|
|
3. Remove the table covers.
|
|
|
4. Remove the accessory rail strip from both sides.
|
|
5. Preset the leveling pad heights to 20 mm and lower
the table until it nearly rests on the leveling pads. Leave the shipping
bolts in place.
|
|