1 Installer/FE Notices
1.1 General Safety Guidelines
-
Follow all safety precautions, warnings and instructions in this manual.
-
Read and obey the warning and instructions on equipment labels or tags.
-
Allow only qualified personnel to install, maintain and service this equipment.
-
While the system is designed to meet all safety requirements applicable to medical equipment, qualified operators must understand the potential safety hazards, and take steps to minimize the risk at all times.
-
Never modify the system in whole or part without prior written approval by GE Healthcare
-
Do not change, add or remove any system accessory without prior written approval of the vendors local service manager.
-
Never leave the system in an unsafe condition. Notify the customer that the system is not to be used until a problem is resolved.
-
Read and follow the precautions described in this manual.
1.2 Shipping, Warehouse and Transportation Warning
This gantry should be moved using the shipping dollies only. Do not lift or move it using a lift truck under the gantry frame.
1.3 International Shipments
-
Use dollies to remove the gantry from the shipping skid and to transport the gantry to the customer’s site.
-
If lifting is required, instructions are in the Pre-Installation Manual for this system.
1.4 On Site Warning
This system requires a gantry bearing gap inspection before electrical calibration is started.
1.5 Service Actions
If the bearing inspection fails the FE opens a dispatch and does not continue with the electrical calibration procedures.
2 Introduction
This chapter describes how to mount, position, and level the CT scanner subsystems.
Before you start the installation, make sure the site preparation complies with conditions and instructions found in the Pre-installation Manual for this system. Failure to comply results in excessive installation delay and potential increased, unrecoverable installation costs. This product is designed to meet specific mechanical installation standards that should be reviewed prior to installing this system.
2.1 Overview
Installation paperwork is required for all installations.
Procedures in this chapter provide detailed instructions to position, level, and anchor the gantry and table securely for operation. The system uses adjustable leveling pads to support the gantry and table. The gantry has four (4) primary leveling pads located on the gantry base. The table has four (4) pads used for leveling it.
The process you follow is:
-
Use the room-layout template to determine the general position of the gantry and table.
-
Move the gantry into position.
-
Level gantry.
-
Use the laser tool to position the table relative to the gantry.
-
Level the table to the gantry, and anchor the system.
-
Complete the mechanical installation section of GE Form e4879.
Use the template to position the system. Use the gantry and table to locate and drill the anchor holes. Drill the anchor holes with the system in place. See Mark Equipment Anchoring Locations for an example of this procedure. This CT system installation procedure requires the items listed in Required Common Tools and Supplies.
2.2 Pre-Installation Template
Always use the room layout template (two pieces), during installation. The gantry and table are not properly aligned if existing holes are used. The template shows the location of the gantry and table anchor holes.
The applicable template is shipped with the system. It is located on the middle shelf on the Lean Installation Cart. You can also order it via the web GEMS BUY, from Coakley-Tech.
Room Layout Template - Part Number 5111499
2.3 Required Common Tools and Supplies
The following tools and supplies should be included in the standard CT installation tool kit. The tools listed represent the minimum tools required for installing this CT scanner.
Wrenches
-
Standard and metric combination wrench sets
-
Standard and metric hex key (Allen wrench) sets
-
1/2 in. and 3/8 in. drive torque wrench: 0-100 N-m (0-100 ft.-lb.) Must be calibrated yearly.
Sockets and Extensions
-
3/8 in. drive metric and standard socket set
-
1 in, 1-1/8 in, 1-1/4 in, 1-1/2 in, 1-5/8 in sockets
-
1/2 in. drive ratchet wrenches
-
3/4 in. deep well socket
-
Metric hex bit set 1/4 in. or 3/8 in. drive, including 10 mm and 14 mm hex bit
-
3/8 in. drive universal joint
-
21 mm socket (optional)
Screwdrivers
-
Torque Screwdriver
-
Phillips screwdriver set (small, medium, and large)
-
Straight blade screwdriver set (small, medium, and large)
-
Pozi-drive 0 (S)
-
Pozi-drive #1
-
Hex bit set with: Flat blade bit, Plus blade bit, Hex bits, and Star bits.
Drill Bits
-
Complete set of standard (U.S.) drill bits (optional)
-
Metric tap set (Optional)
-
½ in. masonry bit, min. 10 in. long USA; 12 in. optional (Bit must not be metric.)
-
4 in. (100 mm) hole saw with 1/4 in. (6 mm) masonry bit (to remove flooring)
Power Tools
-
3/8 in. or ½ in. drill, cordless or electric
-
Reciprocating saw (Sawzall or equivalent) and assorted blades
-
Hammer drill & bit (8 in. min, 12 in. max)
-
Sears shop vacuum or equivalent, with HEPA filter
-
25 ft. extension power cords
Electrical Tools
-
DVM capable of reading 0.5 ohms or less
-
Continuity Tester
-
FE Electronic Monitor Static Kit or equivalent static mat kit with ground wrist strap (P/N 2220482)
-
Dale 600 or 601 Leakage meter or equivalent
-
Temperature/humidity tool: Oregon Scientific Wireless Weather Station Model BAR608HGA or equivalent
Hand Tools
-
Ball-peen hammer (1 lb. or 2 lb.)
-
Tongue & groove pliers (large)
-
Diagonal cutting pliers, large (to cut 1/0 ground)
-
Diagonal cutting pliers, small and large
-
Large pry bar 460 mm – 600 mm (18 in.–24 in.)
Recommended Levels
-
Johnson Magnetic Level, model 7500M – 225 mm (9 in.)
-
Johnson Professional Box Beam Level, model 9624 – 600 mm (24 in.)
-
Level (9 in.)
-
Johnson Professional Box Beam Level – 1225 mm (48 in.) (Optional)
Personal Safety Equipment*
-
Safety shoes
-
Safety glasses
-
Hand Protection (Leather is required when performing duct work.)
-
Knee pads or kneeling pad
-
Face Shield
-
LOTO kit -- MUST have tags and appropriate lock(s)
-
Hearing protection
-
2 m (6 ft.) or 4 m (8 ft.) step ladders or equivalent
* Review all Job Safety Assessment Requirements
System Cleaners
Purchase Locally:
-
Alcohol
-
10% Bleach
-
Scrubbing Bubbles bathroom cleaner or equivalent
-
Sani-cloth HB
-
Incidin Plus
-
TriGrene
Other
Purchase locally (available at office supply stores): a China marker or wax marking pencil or equivalent, any color that is visible on the floor where the system is being installed. Permanent markers are often used if the lines will be covered by the product.
GE Tools
System Alignment Kit (p/n 5148193 or p/n 5272090-2)
(This tool may not be available via the tool pool in some areas.)