Installs the oil catch pan onto the dockable patient table.
Prerequisites
| Personnel requirements |
|---|
| Required persons | Preliminary requirements | Procedure | Finalization |
|---|
| 1 | - | 20 minutes | - |
| Tools and test equipment |
|---|
| Item | Quantity | Part number | Manufacturer |
|---|
| Nonmagnetic Titanium Service Tool Kit, Small Set | 1 | 5113258 | - |
About this task
Do the following tasks to complete installation of the oil catch pan:- Installing the oil catch pan
- Installing the left-hand base side cover
- Installing the right-hand base side cover
- Lowering the raised dockable table bellows