• SIGNA™ Hero 3.0T Service Methods
  • 5852800-8EN Revision 1.0
  • Object ID: 00000018WIA30719350GYZ
  • Topic ID: id_2020601 Version: 3.1
  • Date: Dec 14, 2021 3:16:16 PM

Doing ICW dockable table adjustments

Adjusts the table dock and the dockable table to align the table with the magnet bore.

Prerequisites

Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1-2 hours-
Tools and test equipment
ItemQuantityPart numberManufacturer
PH Alignment and Magnet Leveling Kit15897979-
150 mm Plastic Dial Caliper with Metric Readout15916010-
Nonmagnetic Titanium Service Tool Kit, Small Set15113258-
Safety

Before working in any GE Healthcare MR suite or performing any GE Healthcare service procedure, you must:

  • Have read and understood all hazard conditions and safety requirements in the latest revision of the GE Healthcare MR Service Safety Manual (5452735).
  • Have successfully completed all relevant GE Healthcare Environmental Health and Safety (EHS) courses (or for non-GE employees, equivalent workplace training courses).
  • Comply with all site-specific training and workplace safety requirements.

If you have any safety concerns at any time, do not begin work or immediately stop work and move to a safe location. Immediately contact your supervisor or site safety officer for instructions on how to proceed.

About this task

The following installations and adjustments must be completed and checked off when doing the dockable table adjustments in Installation mode.
Note: Download and open the Alignment Data Sheet Macro (DOC2647017) from the online documentation library to use during table adjustments.
Figure 1. ICW table adjustments - dockable table