Checking off ICW Magnet Ramping items

Procedure

  1. Ramp and shim the magnet.
    Refer to 3.0T UA Series Magnets Magnet Handling Manual (5836648-1EN) for the specific procedures listed below.
    ICW CheckProcedure
    Are magnet pre-ramp requirements done?Ramping a magnet
    Is magnet Rundown unit functional check done?Magnet Rundown Unit (MRU) Inspection
    Is magnet ramping done?Ramping a magnet
    Is passive shimming (and Super Con if applicable) done?Shimming a magnet
  2. In the ICW Magnet Ramping section, check off each item to confirm the procedure has been completed.
    Figure 1. ICW magnet ramping items
  3. Click Submit.