TABLE CHECKS AFTER INSTALLATION
Prerequisites
1 Table UP/Down check
Procedure
- Press Down pedal on the Dock FRP Cover ensure that the table moves to the Down most condition.
- Press Up pedal on the Dock FRP Cover ensure that the table moves
to the topmost condition.
Figure 1. Table UP/Down Check

- Ensure that the LPCA Latch comes and latches to the Cradle assembly once table reaching to the top most condition.
2 Cradle In/Out check
Procedure
- Press Cradle in button on the Gantry, ensure that the cradle move inside the Bore.
- Press Cradle out button on the Gantry, ensure that the cradle
moves outside the Bore.
Figure 2. Cradle In/Out check

- Observe for smooth cradle motion without interference with the bridge.
3 Emergency egress Check
Procedure
- Press Cradle in button on the Gantry, Take cradle in by 500mm
approximately. Rotate the Handle on the Cradle, and pull the cradle
out to the home position. Ensure its possible to pull the cradle with
this process.
Figure 3. Emergency egress Check

4 Home sensor Function Check
Procedure
- Press Cradle in button on the Gantry, Take cradle in by 500mm
approximately. Press the Down pedal on the Dock FRP cover. Ensure
that the table is not coming down.
Figure 4. Home sensor Function Check

Finalization
No finalization steps.