TABLE CHECKS AFTER INSTALLATION

Prerequisites

1 Table UP/Down check

Procedure

  1. Press Down pedal on the Dock FRP Cover ensure that the table moves to the Down most condition.
  2. Press Up pedal on the Dock FRP Cover ensure that the table moves to the topmost condition.

    Figure 1. Table UP/Down Check

  3. Ensure that the LPCA Latch comes and latches to the Cradle assembly once table reaching to the top most condition.

2 Cradle In/Out check

Procedure

  1. Press Cradle in button on the Gantry, ensure that the cradle move inside the Bore.
  2. Press Cradle out button on the Gantry, ensure that the cradle moves outside the Bore.

    Figure 2. Cradle In/Out check

  3. Observe for smooth cradle motion without interference with the bridge.

3 Emergency egress Check

Procedure

  1. Press Cradle in button on the Gantry, Take cradle in by 500mm approximately. Rotate the Handle on the Cradle, and pull the cradle out to the home position. Ensure its possible to pull the cradle with this process.

    Figure 3. Emergency egress Check

4 Home sensor Function Check

Procedure

  1. Press Cradle in button on the Gantry, Take cradle in by 500mm approximately. Press the Down pedal on the Dock FRP cover. Ensure that the table is not coming down.

    Figure 4. Home sensor Function Check

5 Finalization

Finalization

No finalization steps.