DC Offset Adjustment

Prerequisites

Procedure

  1. Go to the Service Desktop and select Calibrations from the Service Browser. See Figure 1. Select DC Offset Calibration.

    Figure 1. Selecting DC Offset Calibration in the Service Browser

  2. Select Run .

    A report of “DC Offset calibration has been completed” signifies that the calibration is done. The calibration should only be run once.

  3. The calibration values are stored in /usr/g/caldir/gradient_tune.dat .
    note:

    The calibration values are relative to the site DC Offsets is run on and can vary greatly from site to site.

  4. Perform TPS Reset or end diagnostics.

Finalization

No finalization steps.