Bridge Removal

Prerequisites

Perform the following steps at the front of the magnet:

1 Fixed Sites

See the twelve steps in the following three illustrations, or, for greater detail, perform the procedure Bridge Replacement.

Procedure

  1. Bridge Removal - Sequence 1 (Figure 1).

    Figure 1. BRIDGE REMOVAL - SEQUENCE 1

  2. Bridge Removal -Sequence 2 (Figure 2)

    Figure 2. BRIDGE REMOVAL - SEQUENCE 2

  3. Bridge Removal - Sequence 3 (Figure 3).

    Figure 3. BRIDGE REMOVAL - SEQUENCE 3

2 Mobiles

Procedure

  1. See Fixed Sites
  2. This describes the removal of the rear pedestal and rear bulkhead, necessary for preparing any mobile for replacement of the combined body coil. See Figure 4.

    Figure 4. REMOVING REAR PEDESTAL IN MOBILES

3 Finalization

Finalization

No finalization steps.