|
Test
|
Procedure
|
Criteria for Passing
|
Notes
|
| PM Schedule |
Run once at time of system turnover. |
|
|
| Updates |
Go to CSD, PM section and execute PM Patch.
Document can be found in PM Assist |
-
Broadband site: Informs FE of available
Upgrades needed, and Upgrades that have been automatically downloaded,
then prompts FE to load Upgrades.
-
Modem site: Informs FE of available
Upgrades needed. FE must get Upgrades from Website, load onto CD,
then load onto system.
|
No Customer notification |
| LVShim |
Go to CSD, PM section and execute LVShim. Document
can be found in PM Assist |
Must meet Customer Acceptance values in following
links (BRM WB (Whole Body)) |
Customer receives warning message for failures
21 days following PM. IBIS logs failure |
| SPT |
Go to CSD, PM section and execute SPT. Document
can be found in PM Assist |
There can be no Severe failures in the following tests:
Head SNR
Head Coherent Noise
Head FSE Stability
Head GRE Stability
Head Eddy Currents
Body Shimming
Body SNR
Body FSE Stability
Body GRE Stability
|
Customer receives warning message for failures
21 days following PM. IBIS logs failure |
| White Pixel |
Go to CSD, PM section and execute EPT. Document
can be found in PM Assist |
Run test only. White Pixel failures not counted
by IBIS. This is for trending/data-collection purposes only. |
No Customer notification |
| PM Check |
Run this script after all checks noted above
have been executed |
|
|