• Optima MR450w BASE 1.5T System Service Methods
  • 5690012-2EN Revision 3
  • Object ID: 00000018WIA308D0F20GYZ
  • Topic ID: id_13107117 Version: 3.0
  • Date: Aug 29, 2019 1:53:57 AM

1.5T 8 Channel Wrist Array Cable and Post Replacement

Prerequisites

Table 1. Personnel requirements
Required personsPreliminary requirementsProcedureFinalization
1Not Applicable30 for Cable Replacement; 45 for Post Replacement minutesNot Applicable
Table 2. Tools and test equipment
ItemQuantityEffectivityPart numberManufacturer
Standard Tool Kit1---
ESD Grounding Wrist Strap1---
Table 3. Replacement parts
ItemQuantityEffectivityPart numberManufacturer
Refer to the FRU document 1---

About this task

Follow this process to replace field replaceable units on the 1.5T HD 8 Channel Wrist Array by Invivo.

Cable Replacement

Procedure

  1. Turn the coil upside down to access the cable assembly.
  2. Remove the 4 screws securing the cable assembly. Make sure to identify which screws are located in each hole as the screw sizes differ.
    Figure 1. HD Wrist Array FRU
  3. Use indentation on each side of the part to remove the FRU after removing screws.
    Figure 2. Remove The FRU
    Figure 3. HD Wrist Array FRU Interior View
  4. Replace the cable assembly with the new one. Make sure to seat the connector firmly once located in place and then reinstall 4 screws.
    Figure 4. Wrist Array FRU Replacement

Post Replacement

Procedure

  1. Remove the six cable assembly screws and the cable assembly, then remove the four cover screws and the top cover.
    Figure 5. Cable and Cover Removal
  2. Turn the Top Cover over and remove the six top post block screws, then remove the top post block assembly. Replace the parts as shown below as needed.
    Figure 6. Top Post Block Disassembly
  3. Remove the four side post block assembly screws (see Figure 5). Replace the parts as shown below as needed.
    Figure 7. Top Post Block Disassembly
  4. Reassemble the coil using the steps above.

Finalization

Finalization

For Cable Replacement: Perform an MCQA test as explained in the 1.5T 8 Channel Wrist Array MCQA Test Setup document.

For Post Replacement: Attach coil to baseplate to ensure proper part installation.