- Topic ID: id_11038882
- Version: 4.0
- Date: Mar 29, 2022 8:54:16 AM
PDU Spare Part Replacement Procedures
Prerequisites
This procedure covers the replacement of components within the PDU. If necessary, refer to the PDU Covers Remove/Install procedure.
Refer to the following table for a list of spare part replacements.
1 24 VDC Supply Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield.
- Remove the connectors from the 24 VDC Power Supply (located in the lower right corner of the PDU).
- Remove the two screws holding the 24 VDC Power Supply in place.
- Remove the 24 VDC Power Supply from the PDU.
-
(For Re-Install)
- Install the new 24 VDC Power Supply in the PDU and secure it with the screws removed earlier.
- Attach the connectors to the replacement 24 VDC Power Supply.
- Install the front plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
2 Capacitor Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield.
- Remove the plate on top of the capacitors by removing the eight
screws and connectors.note:
Observe capacitor polarity and connector alignment.
- Loosen the clamping screw holding the capacitor in place.
- Slide the capacitor out towards the front of the PDU.
-
(For Re-Install)
- Slide in the new capacitor.
- Tighten the clamping screw around the new capacitor to hold it in place.
- Install the plate over the capacitors using the 8 screws previously removed, attaching all connectors to their original connections.
- Install the front plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
3 Circuit Breaker Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield.
- Remove the wires connected to the failed circuit breaker.
- Remove the screws or restraint device holding the circuit breaker in place.
- Remove the circuit breaker.
-
(For Re-Install)
- Install the new circuit breaker.
- Install the screws or restraint device holding the circuit breaker in place.
- Connect the previously removed wires to the circuit breaker.
- Install the front plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
4 Contactor Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield.
- Remove the wires connected to the failed Contactor.
- Remove the four screws holding the Contactor in place.
- Remove the Contactor.
-
(For Re-Install)
- Install the new Contactor.
- Install the four screws holding the Contactor in place.
- Connect the wires to the Contactor.
- Install the front plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
5 Diode Bridge Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield.
- Remove the wires connected to the failed Diode Bridge.
- Remove the two screws holding the Diode Bridge in place.
- Remove the Diode Bridge.
-
(For Re-Install)
- Install the new Diode Bridge.
- Install the two screws holding the Diode Bridge in place.
- Connect the wires to the Diode Bridge.
- Install the front plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
6 E-Stop Switch Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield. (Top plastic cover may also be removed if necessary.)
- Remove the two screws holding the E-Stop Switch mount to the chassis.
- Remove the wires connected to the E-Stop Switch.
- Loosen the housing holding the E-Stop Switch in place.
- Remove the E-Stop Switch.
-
(For Re-Install)
- Install the new E-Stop Switch.
- Tighten the housing to hold the E-Stop Switch in place.
- Connect the wires to the E-Stop Switch.
- Install the switch mount using the two screws removed earlier.
- Install the front plastic safety shield. (Also install top plastic cover if it was removed.)
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
7 Fuse Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield.
- Remove the failed fuse from the fuse holder device by removing the two bolts holding the fuse in place.
-
(For Re-Install)
- Install the new fuse using the two previously removed bolts.
- Install the front plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
8 Indicator Lamp Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield. (Top plastic cover may also be removed if necessary.)
- Remove the wires connected to the failed Indicator Lamp.
- Loosen the housing holding the Indicator Lamp in place.
- Remove the socket of the Indicator Lamp.
-
(For Re-Install)
- Install the new socket of the affected Indicator Lamp
- Tighten the housing holding the Indicator Lamp in place.
- Connect wires to the Indicator Lamp.
- Install the front plastic safety shield. (Also install top plastic cover if it was removed.)
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
9 PDU Control Board Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield.
- Remove the plug connectors from the PDU Control Board (located in the upper right corner of the compartment).
- Remove the cable connector at the bottom of the PDU Control Board.
- Remove the seven screws holding the PDU Control Board in place.
- Remove the PDU Control Board from the PDU.
-
(For Re-Install)
- Install the PDU Control Board in the PDU and secure it with the screws removed earlier.
- Attach the cable connector to the replacement PDU Control Board.
- Attach the plugs into the connectors on the replacement PDU Control Board.
- Install the front plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
10 Relay Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the front plastic safety shield.
- Release retaining clips on failed relay.
- Remove the relay.
-
(For Re-Install)
- Insert the new relay into place.
- Install clip restraint device to hold the relay.
- Install the front plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
11 Soft Start Resistor Replacement
Procedure
-
(For Removal)
- Make sure to follow all Lockout/Tagout requirements while performing this procedure. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
- Remove the Top Cover and Front Cover of the PDU.
- Remove the top plastic safety shield.
- Remove the wires connected to the failed Soft Start Resistor assembly.
- Remove the two screws holding the Soft Start Resistor assembly in place.
- Remove the Soft Start Resistor assembly.
-
(For Re-Install)
- Install the new Soft Start Resistor assembly.
- Install the two screws holding the Soft Start Resistor assembly in place.
- Connect the wires to the Soft Start Resistor assembly.
- Install the top plastic safety shield.
- Install the PDU Front Cover and Top Cover.
- Remove all Lockout/tagout devices installed.
- Restore power to the system. Refer to “Equipment Service - Lockout-Tagout-PPE” procedure in Safety folder of publication.
12 Finalization
Perform Daily Quality Assurance (DQA) scan or equivalent to verify system operation.