- Topic ID: id_17423020
- Version: 4.0
- Date: Jan 20, 2020 8:34:20 PM
Gantry Heater Fuse Holder Replacement
Prerequisites
Overview
This procedure defines the necessary steps to Remove and Install the fuse holder of gantry heater.
1 Preparation
Procedure
- Move table to home position, fully out and down.
- Remove right side gantry cover.
Refer to Parts Replacement → Gantry → Enclosure → (Cover Removal Procedure).
- Stop the rotor of X-ray tube in case of Liquid Bearing Tube before HVDC off. Refer to Liquid Bearing Tube Rotor stop procedure for details.
- Turn OFF the Axial Drive and HVDC switches on the gantry’s Service Switch Panel.
- Position the x-ray tube at 5 o'clock and lock gantry rotation.
Figure 1. Location of Fuse Holder

- Turn OFF the 120 VAC switch on the gantry’s Service Switch Panel.
- Remove the gantry left side cover, top covers and front cover.
2 Replacement Procedure
Procedure
- Disconnect two cables from the rear of the fuse holder.
Figure 2. Fuse Holder Removal

- Remove the fixing screw and remove the fuse holder form the bracket.
- Install the new fuse holder into place, and fix the fuse holder using fixing screw.
- Connect the two cables.
3 Gantry Reassembly
Procedure
- Make sure the Axial Drive, HVDC and 120 VAC switches on the gantry’s Service Switch Panel are OFF.
- Release the gantry rotational lock and install gantry covers,
all except the right side cover.
Refer to Replacement → Gantry → Enclosure → (Cover Removal Procedures).
- Turn on the 120 VAC, HVDC and Axial drive service switches.
- Rotate the gantry by hands, and confirm no parts hits inside the gantry.
- Install gantry right side cover.
4 Finalization
Procedure
- Perform a [Quality Assurance Test] from the [Functional Checks] menu of the service manual to ensure system operation.